National Institute of Technology Rourkela

राष्ट्रीय प्रौद्योगिकी संस्थान राउरकेला

ଜାତୀୟ ପ୍ରଯୁକ୍ତି ପ୍ରତିଷ୍ଠାନ ରାଉରକେଲା

An Institute of National Importance

Syllabus

Course Details

Subject {L-T-P / C} : ME6237 : Production Planning and Control { 3-0-0 / 3}

Subject Nature : Theory

Coordinator : Siba Sankar Mahapatra

Syllabus

Module 1 :

Module 1 (3 hours): Introduction: overview of planning and control, production planning, production control, functions of production planning and control, short range and long range planning, types of production,

Module 2 (6 hours): Work study-Method study, basic procedure-Selection-Recording of process – Critical analysis, Development – Implementation – Micro motion and memo motion study – work measurement – Techniques of work measurement – Time study – Production study –Work sampling – Synthesis from standard data – Predetermined motion time standards.

Module 3 (6 hours): Forecasting: principles of forecasting, forecasting techniques, forecast error, Product planning-Extending the original product information-Value analysis-Problems in lack of product planning-Process planning and routing-Pre requisite information needed for process planning-Steps in process planning-Quantity determination in batch.

Module 4 (9 hours): Production-Machine capacity, balancing analysis of process capabilities in a multi-product system. Aggregate planning, Master production scheduling, Material requirement planning (MRP): MRP Basics, MRP II, principles and procedure for material planning, bill of materials, Enterprise resource planning (ERP), Capacity Management: Basics of capacity management, capacity planning, Capacity requirements planning (CRP), capacity management strategies,

Module 5 (6 hours) : Inventory Control: Basic concepts of inventory, categories of inventory, inventory costs, EOQ, inventory models, inventory classification techniques, Factors affecting Inventory, inventory control.

Module 6 (6 hours): Scheduling and control of production: Scheduling methods, dispatching rules, Gantt charts, line of balance– Flow production scheduling-Batch production scheduling Integrated production planning and control: Lean production and JIT, pull system, kanban, theory of constraint, FMS, OPT, TOC.

Course Objective

1 .

Familiarization of concepts of production planning and control among the studuents

2 .

Solution of practical industrial problems with the concept of production planning and control

3 .

Familiarization OM software for solving real-life problems

4 .

Accustomed to best practices in industries with the help of concept of production planning and control

Course Outcome

1 .

Introduction to Short Range and Long Range Production Planning and Control
Detailed analysis of Work System Design
Analysis of Forecasting Methods based on time series, cause-effect and synthesis of expert opinion
Practical application of MRP, CRP, ERP in manufacturing
Detailed study on inventory control, job scheduling, and lean manufacturing systems

Essential Reading

1 .

S.K. Mukhopadhyay, Production Planning and Control, Prentice Hall , Second Edition

2 .

J. Heizer, B. Render, J. Rajashekhar, Operations Management, Prentice Hall , Ninth Edition

Supplementary Reading

1 .

J. R. King, Production Planning and Control, Pergamon Press , Second Edition

2 .

Elwood S.Buffa, and Rakesh K.Sarin, Modern Production / Operations Management, John Wiley and Sons , Eighth Edition

Journal and Conferences

1 .

Journal: Production Planning & Control, Taylor and Francis

2 .

Conference: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)